Saturday, June 25, 2011
New ContiComfortContact CC5
Conti ComfortContact CC5
Noise Breaker
Feature
Noise Breaker from Conti Silent Tread Pattern Groove Technology
Effect
Breaks air-waves in longitudinal grooves
Benefit
Reduces noise without compromising other performances
Comfortable tyre
Feature
V-Shaped Siped inner ribs
Effect
Smooth rolling throughout the tyre circumferential
Benefit
Optimum driving comfort coupled with optimum safety performance
Fuel Saving
Feature
Advanced Silica Compound Technology
Effect
Minimized rolling resistance forces for better fuel efficiency and also lower CO2 emissions
Benefit
Improve fuel economy
Tuesday, June 21, 2011
ASEAN ELENEX 2011 & INDUSTRIAL AUTOMATION 2011 SHOWING THIS JULY!
ASEAN Elenex 2011 (AE 2011) and Industrial Automation 2011 (IA 2011) will be held from 20 – 23 July 2011 at Kuala Lumpur Convention Centre. This would be an ideal business sourcing platform of Transmission & Distribution and Electrical Engineering as well as the Manufacturing Industry.
Comprising over 7,000 sq. metres of gross exhibition space, occupied by more than 400 participation companies from 29 nations, AE 2011 & IA 2011 are shows not to be missed. Some of these key industry players include Ancom, Electrical Components, Infrakomas, Megalux Lightings, Mikro, Ulusoy Electric, United U-Li Corporation Berhad, Delta Mechatronic Malaysia, Edex, Harting KGAA, KVC Industrial Supplies, Lenze, Metalworking Asia, National Instruments, Rockwell, SIEMENS and many more.
At AE 2011 & IA 2011, we will also see German and Romanian Country pavilions as well as industry pavilions from Tenaga Nasional Berhad (BVDP) and The Electrical & Electronics Association of Malaysia (TEEAM). A group from China will also be participating.
We are expecting more than 8,000 trade visitors over the 4-day period. Why not be one of the first to pre-register and enjoy the benefits of pre-booking your visitor badge! All you have to do is Pre – Register by clicking HERE and obtain your visitor badge from the dedicated “Pre-Reg counters” at the exhibition for hassle free entrance and yes a COMPLIMENTARY copy of the AE & IA 2011 Show Directory is all yours.
Don’t miss this opportunity and pre-register online today!
Deadline for pre-registration is on the 18th July 2011.
Show Opening Hours
20 - 22 July 2011
10:00am - 6:00pm
23 July 2011
10:00am - 5:00pm
CONFERENCE
A 2-day conference will be held on the 21st & 22nd July 2011. There will be two different conferences happening at the same time catering to the related industry products and services. One will be the CIRED's "SMART GRID" Conference and the other is the Energy Commission's "National Level Electrical Safety Seminar". Details of the above mention conference are as follows:
1.CIRED's "SMART GRID" conference
Date: 21st and 22nd July 2011
Venue: Plenary Theatre, KLCC
Estimated: 300 delegates
Person in charge: Zurina Manaf
TNB unit wins job in Pakistan
It seals RM43mil operation and maintenance agreement with Laraib Energy
KUALA LUMPUR: Tenaga Nasional Bhd's (TNB) unit TNB Repair and Maintenance Sdn Bhd (TNB Remaco) has secured an operation and maintenance agreement worth US$14.1mil (RM43mil) from Pakistan's Laraib Energy Ltd.
TNB Remaco will be the operator of the 84MW New Bong Escape Hydroelectric Power Complex on the Jhelum River in Azad Jammu and Kashmir.
“Under the contract, TNB Remaco will provide services for an initial period of five years with an option of extending for another seven years,” president/chief executive officer Datuk Seri Che Khalib Mohamad Noh said at the signing ceremony between TNB Remaco and Laraib Energy yesterday.
Khalib who is also the chairman of TNB Remaco said the 15-month mobilisation period was expected to commence in August.
Technical tie-up: Khalib (left) exchanging documents with Harris. With them are (from left) Energy, Water and Communications MInistry deputy secretary-general Badaruddin Mahyuddin and Pakistani Deputy High Commissioner Imtiaz A. Kazi. - Starpic by Rohaizat bin Md Darus
TNB Remaco will provide technical personnel and skilled expertise to perform daily operations as well as routine maintenance of the complex.
“This new agreement marks TNB Remaco's second collaboration with HUB Power Co (a major shareholder of Laraib Energy). The first being the operation and maintenance agreement for the 213.6MW diesel and co-generation power plant in Punjab, Pakistan,” said Khalib.
He said the agreement would further augment TNB Remaco's reputation as a one-stop service provider for power-related works and also identified TNB Remaco's repair centre as a regional repair hub, in line with TNB's aim to be a global brand.
Laraib Energy's chairman and Hub Power Co's chief executive officer Vince Harris said the company had invested some US$235mil on the hydroelectric power plant and it was well advanced in commercialisation.
He described the 84MW hydroelectric plant as a “major infrastructure project.”
Harris said TNB Remaco won the job as the group was confident with its capability and expertise.
Khalib said the company was “looking” at various opportunities for maintenance job including in Indonesia and Brunei.
He said TNB Remaco's strategy was to provide services and not buying assets.
TNB Remaco managing director Nor Azman Mufti said the group aimed to increase its overseas' revenue contribution to 40% from 10% currently.
Khalib said TNB had been working closely with the Government on the negotiation with independent power purchasers (IPP). “We look forward for the positive outcome of the negotiation with IPPs.”
He, however, declined to reveal details of the negotiations. “The details are best answered by the Government.”
Meanwhile, Khalib said TNB would not be extending its power purchase with PowerSeraya Ltd, a unit of YTL Power International Bhd when it expired on June 15.
“At the moment there's no need to extend it. We will only know if we need to purchase from Singapore at the next curtailment at the end of the month whereby Petroliam Nasional Bhd-owned gas production platform will undergo maintenance work,” he said.
Khalib said the purchase represented only 1% of total demand. He explained that TNB was buying power across the border for security reason and it was normal for any utility company to make such purchases.
“We have managed to pull through in the past two major curtailment. We're confident to pull it through this time as well,” he said, adding that there was no shortage of power supply and it had an excess capacity of 40% currently.
KUALA LUMPUR: Tenaga Nasional Bhd's (TNB) unit TNB Repair and Maintenance Sdn Bhd (TNB Remaco) has secured an operation and maintenance agreement worth US$14.1mil (RM43mil) from Pakistan's Laraib Energy Ltd.
TNB Remaco will be the operator of the 84MW New Bong Escape Hydroelectric Power Complex on the Jhelum River in Azad Jammu and Kashmir.
“Under the contract, TNB Remaco will provide services for an initial period of five years with an option of extending for another seven years,” president/chief executive officer Datuk Seri Che Khalib Mohamad Noh said at the signing ceremony between TNB Remaco and Laraib Energy yesterday.
Khalib who is also the chairman of TNB Remaco said the 15-month mobilisation period was expected to commence in August.
Technical tie-up: Khalib (left) exchanging documents with Harris. With them are (from left) Energy, Water and Communications MInistry deputy secretary-general Badaruddin Mahyuddin and Pakistani Deputy High Commissioner Imtiaz A. Kazi. - Starpic by Rohaizat bin Md Darus
TNB Remaco will provide technical personnel and skilled expertise to perform daily operations as well as routine maintenance of the complex.
“This new agreement marks TNB Remaco's second collaboration with HUB Power Co (a major shareholder of Laraib Energy). The first being the operation and maintenance agreement for the 213.6MW diesel and co-generation power plant in Punjab, Pakistan,” said Khalib.
He said the agreement would further augment TNB Remaco's reputation as a one-stop service provider for power-related works and also identified TNB Remaco's repair centre as a regional repair hub, in line with TNB's aim to be a global brand.
Laraib Energy's chairman and Hub Power Co's chief executive officer Vince Harris said the company had invested some US$235mil on the hydroelectric power plant and it was well advanced in commercialisation.
He described the 84MW hydroelectric plant as a “major infrastructure project.”
Harris said TNB Remaco won the job as the group was confident with its capability and expertise.
Khalib said the company was “looking” at various opportunities for maintenance job including in Indonesia and Brunei.
He said TNB Remaco's strategy was to provide services and not buying assets.
TNB Remaco managing director Nor Azman Mufti said the group aimed to increase its overseas' revenue contribution to 40% from 10% currently.
Khalib said TNB had been working closely with the Government on the negotiation with independent power purchasers (IPP). “We look forward for the positive outcome of the negotiation with IPPs.”
He, however, declined to reveal details of the negotiations. “The details are best answered by the Government.”
Meanwhile, Khalib said TNB would not be extending its power purchase with PowerSeraya Ltd, a unit of YTL Power International Bhd when it expired on June 15.
“At the moment there's no need to extend it. We will only know if we need to purchase from Singapore at the next curtailment at the end of the month whereby Petroliam Nasional Bhd-owned gas production platform will undergo maintenance work,” he said.
Khalib said the purchase represented only 1% of total demand. He explained that TNB was buying power across the border for security reason and it was normal for any utility company to make such purchases.
“We have managed to pull through in the past two major curtailment. We're confident to pull it through this time as well,” he said, adding that there was no shortage of power supply and it had an excess capacity of 40% currently.
Saturday, June 18, 2011
New Myvi 2011 - Specifications and prices
New Myvi 2011 - Specifications and prices
1.3 SX STANDARD
On the road price RM 43,900
Monthly payment 9 years RM 480.95
1.3 EZ STANDARD
On the road price RM 46,900
Monthly payment 9 years RM 513.82
1.3 SXI PREMIUM
On the road price RM 46,900
Monthly payment 9 years RM 513.82
1.3 EZI PREMIUM
On the road price RM 49,900
Monthly payment 9 years RM 546.70
1.3 SXE ELEGANCE
On the road price RM 53,900
Monthly payment 9 years RM 590.53
1.3 EZE ELEGANCE
On the road price RM 56,900
Monthly payment 9 years RM 623.41
more details: perodua
On the road price RM 43,900
Monthly payment 9 years RM 480.95
1.3 EZ STANDARD
On the road price RM 46,900
Monthly payment 9 years RM 513.82
1.3 SXI PREMIUM
On the road price RM 46,900
Monthly payment 9 years RM 513.82
1.3 EZI PREMIUM
On the road price RM 49,900
Monthly payment 9 years RM 546.70
1.3 SXE ELEGANCE
On the road price RM 53,900
Monthly payment 9 years RM 590.53
1.3 EZE ELEGANCE
On the road price RM 56,900
Monthly payment 9 years RM 623.41
Tuesday, June 14, 2011
Samsung Galaxy Tab - All The Great Features (Official Promo Video) [HD]
Samsung Galaxy Tab is loaded with superb cool features, and is going to give the iPad a real tough fight. The widgets interface is specifically neat!
The video shows other features, all titled under the "It's Go Time" slogan.
For more check out http://galaxytab.samsungmobile.com
The video shows other features, all titled under the "It's Go Time" slogan.
For more check out http://galaxytab.samsungmobile.com
Features presented:
- Widgets (probably the highlight feature of Android so far)
- Google maps navigation
- Music & Videos portal
- Emails
- 4 e-books apps (very cool)
- 32GB SD memory slot (yes! finally a freedom from storage tyranny)
- Stream to any monitor (yet another neat capability)
- 7 Hours battery life
- Front webcam for video chat
- Adobe Flash support for games and apps (well, surely that you won't have on the iPad).
http://youtu.be/tHOZZJ_2Wjg?hd=1
Saturday, June 11, 2011
Motorola Xoom - Android 3.0 Tablet
Motorola Zoom - Android 3.0 Tablet
Motorola Xoom Spec
OS Android 3.0 (Honeycomb)
Dimensions 249.1mm (h) x 167.8mm (w) x 12.9mm (d)
Display 10.1 inches 1280×800 resolution
Resolution 1280×800
Weight 730g
Processor 1GHz Dual-core processor NVIDIA Tegra 2
Battery Up to 10 hour video playback
Connectivity 3.5mm, micro USB 2.0 HS, Corporate Sync, Wi-Fi 2.4GHz & 5GHz 802.11b/g/n, Bluetooth 2.1 + EDR + HID
Network 3G, 4G LTE upgradeable, 802.11n w/Personal Hotspot
Messaging/Web/Apps Email (Corporate Sync, Google Mail, POP3/IMAP embedded, Push Email, Yahoo Mail) , WebKit w/ Flash
Audio AAC, AAC+, AMR NB, AMR WB, MP3, XMF
Video 720p capture/1080p playback/streaming, H.263, H.264, MPEG4
Camera 5 MP rear-facing camera with dual LED flash and 2MP front-facing camera
Memory 32GB on board user memory, SD card support after software update, 1GB DDR2 RAM
RAM 1GB DDR2
Input Touch Screen with pinch-to-zoom navigation
OS Android 3.0 (Honeycomb)
Dimensions 249.1mm (h) x 167.8mm (w) x 12.9mm (d)
Display 10.1 inches 1280×800 resolution
Resolution 1280×800
Weight 730g
Processor 1GHz Dual-core processor NVIDIA Tegra 2
Battery Up to 10 hour video playback
Connectivity 3.5mm, micro USB 2.0 HS, Corporate Sync, Wi-Fi 2.4GHz & 5GHz 802.11b/g/n, Bluetooth 2.1 + EDR + HID
Network 3G, 4G LTE upgradeable, 802.11n w/Personal Hotspot
Messaging/Web/Apps Email (Corporate Sync, Google Mail, POP3/IMAP embedded, Push Email, Yahoo Mail) , WebKit w/ Flash
Audio AAC, AAC+, AMR NB, AMR WB, MP3, XMF
Video 720p capture/1080p playback/streaming, H.263, H.264, MPEG4
Camera 5 MP rear-facing camera with dual LED flash and 2MP front-facing camera
Memory 32GB on board user memory, SD card support after software update, 1GB DDR2 RAM
RAM 1GB DDR2
Input Touch Screen with pinch-to-zoom navigation
Subscribe to:
Posts (Atom)